Mr. Michael Constantinou is Architecture Engineering Adviser of YPDSN. Mr. Michael has supporting SMART City and urban planning projects. Mr. Michael working from Cyprus. Mr Micheal is Assistant Professor in Architecture Master’s Degree of RIBA III and Quality Control consultant. Review contractor’s proposed quality control/quality assurance programmes and method statements for various sections of the works making sure that works meet the high of quality in accordance with contra requirements and reference standards. Monitor programmes as to their proper and successful implementation, highlighting and deficiency in programme implementation and recommend corrective action. Review contractor’s shop drawings and submittal for general compliance with contract requirements. Perform general daily site inspections of architectural finishes and related works. Review Contractor’s daily report for completeness and maintain a daily log of major construction events and Q.C. activities on the project. Note problem areas, and issue non-compliance notices and related clearances to deviations from Specifications and outline corrective action required, review contractors’ action of response. Review contractor’s construction problems/proposals and recommend solutions.
EDUCATION
- 1980-1986 CNAA BsC (Honours). DIP ARCHITECTURE.RIBA III Architecture North East London Polytechnic(University of East London) College
- 1978- 1980 Higher National Diploma (HND) Building Technology Higher college of Technology (Frederick University Cyprus) College
- 1970-1976 Apolytirion in building works Nicosia Technical school Hign School.
RELEVANT EXPERIENCE
The Quality Control consultant.
- Review contractor’s proposed quality control/quality assurance programmes and method statements for various sections of the works making sure that works meet the high of quality in accordance with contra requirements and reference standards.
- Monitor programmes as to their proper and successful implementation, highlighting and deficiency in programme implementation and recommend corrective action.
- Review contractor’s shop drawings and submittal for general compliance with contract requirements.
- Perform general daily site inspections of architectural finishes and related works.
- Review Contractor’s daily report for completeness and maintain a daily log of major construction events and Q.C. activities on the project. Note problem areas, and issue non-compliance notices and related clearances to deviations from Specifications and outline corrective action required, review contractors’ action of response.
- Review contractor’s construction problems/proposals and recommend solutions
- 1988-1991 – Michael Constantinou joined the Seifert Group in 1988 and he has been promoted to a Project Associate within one of the operating Groups. Since joining the Seifert Group he has been involved in the design and the administration of the now completed Greenwich View Complex in the London Docklands. He has also completed the Refurbishment and Extension of a banking premise in the West End. His range of experience has been further broadened by his involvement in carrying out design studies for a Major Marina Hotel.
- October 1987 to June 1988 – PROPERTY SERVICES AGENCY – Senior Architectural Assistant / Undergraduate Architect – Prepared finishes schedules, chaired site meeting accompanied the Project Architect for site supervision and participated in the “handover” procedures for Bermondsey UBO project. Also responsible for the preparation of a feasibility study to present to the client and for preparing sketch drawings for squash courts at Government offices located in Great George Street. Also involved with preparing working drawings for the client’s variations and representing the PSA Project architect for the Enfield Unemployment Benefit office.
- May 1987 to September 1987 – TIBBALDS PARTNERSHIP & TERRY FARREL PARTNERSHIP -Year out student/Architectural Assistant – Prepared alternative layouts for the Theatre Royal, Drury Lane and participate in meetings with Westminster Planners and the historic Buildings Commission. Prepared working drawings and production information to prepare the fender documentation for the new Charing Cross Centre. Also involved with feeding data to the CAD operator.
- Jun 1986 to May 1987 – BRITISH RAILWAYS BOARD DEPT OF DESIGN, ENVIRONMENTAL AND ARCHITECTURE. Year out Student/Architectural Assistant5- Part of the design team for the west side accommodation of the Liverpool Street station re-developed. Prepared packages such as new car park. Also responsible for the platform 18 fitting out which involved liaison with the M&E and Structural Engineers working on this project. Responsible for the Preparation of the specification using the NBS system, the design and planning-working drawings.
- Since 1975 to1986 – Worked on a part time basis as an Architectural Assistant/Technician for practices including DD Associates, in Cyprus and Watts & Partners, London. Involved with the renovation of the Bailiffs House, Berkshire including Structural alterations, extension, and new drainage installation. Involved with the feasibility stage and liaised with the client and the contact with the local authority. Also worked Self Employed for a private house extension Dealt with the clients, Local authorities and supervision of work on site.
- 2010-2014 Project Manager House of Cooperation
- 2010-2017 Project Architect Project Manager
- 2009-Present day Project (Architect) Manager
- 2009-2011 Project Architect Project Manager Supervising Architect
- 2009-2011 Project Architect Project Manager
- 2009-2011 Project Architect Project Manager
- 2009-2010 Project Architect Supervising Architect
- 2009-2010 Project Architect Project Manager
- 2006-2008 Supervising Architect Project Manager/Supervision
- 2002-2005 Supervising Architect Supervision General Auditors Offices Government-Public Sector
- 2000-2001 ISO Architect Preparation of iso9000 Cyprus standards organization Government-Public Sector
- 1996-2000 B & CE Engineer Design and Built/Supervision Serco Kalisperas Ltd British Bases
- 1995-1996 Project Manager Design and Built/Supervision Acer(Cyprus)LTD British Bases
- 1995-1996 Site Architect Supervision of the work Aglanjia Municipality Ligth industry
- 1994-1995 Project Manager Project Architect Alkis Ioannides Architects Business centre/hypermarket
- 1991-1994 Supervising Architect Site architecture/supervision Architects Joint Office Housing Estate
- 1988-1991 Architect Associate Project architect/design supervision/office building Seifert International Commercial
- 1987-1988 Project Manager Project architect/design and build supervision/unemployment benefit office Property Services Agency Government
- 1986-1987 Architectural Assistant Project architect/design build/Liverpool station British Railways Board Transport.